Kitchen Renovation - 99.9% done, Friday, April 13

The contractors who installed the counter tops failed to drill pilot holes when installing the bracket that holds the dishwasher in place - this caused the panel next to the dishwasher to split.  They were going to cover it up with caulking compound, but I refused to allow that.  So we had to wait several weeks for a replacement panel to come and for a contractor to come and replace the panel.  That was done this morning, and the dishwasher is now screwed into place.  Other than a few touch ups of paint and trim, the kitchen is 99.9% done.  The color scheme is perfect with the two rugs we got during 2011 in Nepal when we visited the Tibetan Refugee Center while volunteering with Habitat for Humanity.







And now it is on to other projects.

2 comments:

  1. The greens and beiges are very handsome together. LOVE your selections: faucet, solid surface, more drawers v. doors, cabinet hardware. The wine rack is fantastic use of space, while moving fridge away from wall, so fridge door does not crash-open into wall. BEAUTIFUL!

    ReplyDelete
    Replies
    1. Colors are due to Patty's taste, as are many of the trim ideas. When are you coming to visit to see the kitchen and the 30,000 sandhill cranes at Whitewater Draw?

      Delete